All prices are excluding VAT
Pipe package 4, surcharge for pipe insulation
680,00 DKK /meter
Pipe package 5, surcharge for electrical tracing / frost protection
1.390,00 DKK /piece.
Pipe package 6, surcharge for work above 3m height
450,00 DKK /meter
Pipe package 7, pipes for water supply
440,00 DKK /meter
Concrete/stone hole drilling, first hole and start-up
3.250,00 DKK /piece.
Hole drilling in concrete/stone, subsequent holes
1.250,00 DKK /piece.
Hole drilling in brick/gas concrete
800,00 DKK /piece.
Hole drilling, extra cm
25,00 DKK /cm
Fire seal w/ fire cuff
1.160,00 DKK /piece.
Waterproofing with chain seal
1.460,00 DKK /piece.
Hose reel with spray gun, mounted
2.470,00 DKK /piece.
CTS preparation in grinder
3.489,00 DKK /piece.
CTS preparation at tank incl. control box
7.623,00 DKK /piece.
Scissor lift rental
1.640,00 DKK /meter
Urgent call-out on installation (less than 10 days notice)
1.450,00 DKK /piece.
Urgency allowance
2.500,00 DKK
Driving
675,00 DKK
Basic rate
1.075,00 DKK
Hourly rates
895,00 DKK
Har du brug for råd og vejledning, så tøv ikke med at kontakte os.
Udfyld formularen, og vi kontakter dig hurtigst muligt.
If you need advice and guidance, don’t hesitate to contact us.
Fill out the form and we will contact you as soon as possible.